Abstract A-25, CAMP Lease Well

Does anyone have any well completion data on this Aethon Energy horizontal well:

Abstract A-25 CAMP Lease Well 2HB API# 39532100 (spud 9/02/24)

The well is a DUC (Drilled but Uncompleted) well. This means that the well has been drilled but has not yet undergone the completion process, which includes steps like hydraulic fracturing and installing production equipment.

Aethon submitted a Well Record Only Completion Report on 1/6/2025. They usually do this following the completion of drilling, which was on 11/18/2024.

They will submit another CR following well completion and the 24-hour test.

http://webapps.rrc.state.tx.us/CMPL/viewPdfReportFormAction.do?method=cmplG1FormPdf&packetSummaryId=327334

Thank you very much Mr. Herrington. I was hoping you would respond. You are one the most informed people on the forum.

1 Like

Thank you very much. Your information is very helpful.

So the current status is drilled but not completed yet.

Thank you. Looks like will have to wait a while for completion information.

There are two wells being drilled from that pad, so they may finish drilling both before bringing in a frac crew. FracFocus does not have a frac job listed at this time.

Thank you. That’s very interesting and helpful.