Comstock Circle M Allocation 1H Production

Comstock’s first well in the developing LowerBossier/Haynesville play in Robertson and Leon Counties has proved to be a “gusher” in terms of natural gas production. Here are the monthly production figures so far:

4/2022: 364,027 MCF (14 days)

5/2022: 922,044

6/2022: 860,637

7/2022: 917,901

8/2022: 876,040

9/2022: 866,324

10/2022: 9,444 (shut in while Cazey Black A being frac’d)

11/2022: 765,624

12/2022: 897,632

1/2023: 659,888

2/2023: 564,271

3/2023: 474,212

4/2023: 105,816 (wonder what caused the four-month decline?)

5/2023: 672,495

6/2023: 879,398

440 Day Total: 9,835,753 (22,354 MCF/Day)

6/2023 production is bigger than 6/2022

Based on production to date, EUR is expected to be north of 50 BCF, maybe reaching 70 BCF.

And this is their first well in this play…

2 Likes

Are these wells mostly gas?

They are essentially all dry gas…bottom hole temperatures can reach 400 degrees.

1 Like

My property butts up against this pool. In fact the pool for Circle M shows it actually overlaps slightly into my property as my survey says I own Firestation Rd. The road was cut out of my property years ago when the county road commissioner (my grandfather-in-law) originally put in the dirt road.

But I am really wondering what is going on with the adjacent well named Koda drilled by Aethon. My property is leased to Aethon and is in the Koda pool. Koda says it is shut-in on the RRC site. I have called Aethon and all they will tell me is they are still working on it but I have no idea what is going on with it or how long it will remain shut-in. They are calling these wells “screamer wells” as the pipes make a screaming sound due to the high volume and pressure of gas being produced. I have 150 acres that I have 50% of the minerals on with a lease signed at 1/5th in the pool for Koda.

I am hoping them shutting it in now for months has not damaged the well.

1 Like

Allan,

What is the status of the Aethon Energy-Koda 1H? How does the Koda IP compare with the Circle M Allocation 1H?

PM

The Koda 1H went into production in early May. The 24-hour test was run on May 11, but Aethon failed to note the date of first production in their latest completion report (it shows January 28, which appears to be the date drilling was completed). Here’s the monthly production as reported so far:

May: 628,796 MCF

June: 622,464

July: 825,422

Here’s the first three full months’ production for Comstock’s Circle M well:

May 2022: 922,044 MCF

June: 860,637

July: 917,901

No way to know what choke settings each company is using on their wells.

2 Likes

Koda 1H production for August: 882,809 MCF

1 Like