Comstock McCullough Ingram A 1H Completion Report

Comstock filed a CR on this well today:

http://webapps.rrc.state.tx.us/CMPL/viewPdfReportFormAction.do?method=cmplG1FormPdf&packetSummaryId=300860

Highlights:

42,460 MCF production in the 24-hour test

17,836 TVD

Shut In Pressure: 13,150

Producing Interval: 8,256 feet

Frac Numbers:

Water: 4,398 gallons/foot

Sand: 4,001 pounds/foot

Production to date:

June (11 days): 140, 392 MCF

July (31 days): 829,005 MCF (26,742 MCF/day)

2 Likes

This topic was automatically closed after 90 days. New replies are no longer allowed.