Hello, Does anyone know the initial production for the GD Farley 1H? Thanks Joe
Date of first production was 3/13/2024, so no production posted yet on the Texas RRC site.
24-hour test was run on 3/28/2024 and the results were excellent:
38,375 MCF with 3.5 inch orifice
Pressure:
Shut in: 13,600
Flowing: 11,518
1 Like
This topic was automatically closed after 90 days. New replies are no longer allowed.