As reported by the Railroad Commission of Texas. See the Inspections and Violations Data Manual for details.
- Field Name: WILDCAT
- Operator: PINNACLE MINING CORPORATION
- RRC Rule and Description: SWR 8(d)(4)(H)(i)(IV): Other Type Pits Backfill Requirements
- Violation Discovered: June 13, 2018
- Last Infraction Action: Referred to Austin Field Ops for possible legal enforcement
- Compliant on reinspection? Non-compliant in subsequent inspections.