Oasis Petoleum in Cottonwood T158 R92W Sec.9&4 16&24

Oasis has a rig on Section 9 T158 R92W. The pad is 11+ acres and is approved for 8 wells, 4 going North thru 9 and 4 and 4 going South thru 16 and 24. The GIS Map does not show a rig there and the active rig doesn't ether. Does anyone have information on this? 2 well files exist 26385 and 26386.

They just drilled partial verticals and say they will be back within 60 days to resume drilling. Dated March 10 2014. Make of it what you will. If the rigs just left, there could be wells there drilled to total depth and the map has not updated yet. If I had to guess, one well north and one well south. Just because more wells are allowed doesn't mean they are going to be drilled anytime soon.

Rig has just arrived,(last 10 days) according to locals. Four well drilled from T159R92Sec30 2 north 2 south. Ten wells drilled on T158R92Sec30 I believe 5 E. in Cottonwood and 5 W in Enget Lake Field.

day



Duane E Paulson said:

Rig has just arrived,(last 10 days) according to locals. Four well drilled from T159R92Sec30 2 north 2 south. Ten wells drilled on T158R92Sec30 I believe 6 E. in Cottonwood and 4 W in Enget Lake Field.

day

All else fails, you can call the NDIC. They don't really work for us but they are sometimes helpful on things like this that would usually resolve themselves in a few days anyway.