Very disappointing in the well. Currently section 9 was not even perforated is a, 0.78% is in section 9 gotta be something wrong somewhere. Does anybody have any information thank you
Which well are you referring to?
The Order for 201805359 has Section 9 with 48.4971% and Section 4 at 51.5029% Order 698720. Don King 9-4-9-6 2 WHX. Surface location in 16 and drilled north through 9 and into 4.
The Order for 201805363 has Section 9 with 48.6470% and Section 4 at 51.3530%. Order 701668. Don King 9-4-9-6 1MXH Surface lotion in 16 and drilled north into 9 and into 4.
You have two wells. One in the Mississippi Lime and one in the Woodford.
My mistake, Sec9 9n 7w , not 6w
That six miles makes a difference… There are two wells with a surface location in section 9-9N-7W. One is called the Lensgraf 1-9-3XHM and goes north into section 4. The other is the Dobry 16-21-28XHM. It was never designed to have perforations in 9 as it goes a long way south. Dobry finished February 22 and had first sales on Feb 23, 2019. They are sharing a surface location on the far southern end of section 9. You only get paid on the wells that have perforations in your section.
The Lensgraf well finished in April 16 and had first sales April 28, 2019. I see that they only perforated from 16773-21896 which was the far end of the hole in section four. Not sure why they did that. The total later length of the hole was 9965 feet which does cover both sections. Only 5123 feet were perforated. It is possible that they had some directional difficulty and were not in the correct zone for the part that was in section 9. Happens sometimes.