Set conductor today on charter oak Tigris 1 near wayne
Getting close to M I R U. LET THE ADVENTURE BEGIN
Do they skid the rig for two wells or do they kickoff for second well. They only set one conductor
It depends upon what kind of rig it is and what the plans for the pad are. Some rig settings have slots where they move the derrick over a few feet and drill a new surface pilot hole. Other rigs “walk” and skid over, others have to be moved.
Ty. Have u seen a permit yet mbarnes?
I was expecting 2 south horizontal woodfords each with huge 27 million gallon Frac on tigris1
Surface drilled and casing set. Building tank battery on loc. waiting for rotary