Update on Staghorn well in Caddo 28?

Does anyone have an update on the Staghorn well swing drilled in 28 11N 12W in Caddo county? Thank you

If you are talking about the Triple Crown 11-12-33-28 1HW, the well was spud on 9/9/23 and looks like a rig is still on location.

Any idea why they have not TD the well?

It can take five months to drill and complete a long well. Or they might have had mechanical trouble. They may be waiting on a frac crew. Posting completion reports usually takes another four months. Time will tell.

Perfect. Thank you. Much appreciated.

A notification of spud does not necessarily mean there is a rig on location capable of drill the well to total depth.

Rig has moved offsite now. The well is listed as DUC-drilled Uncompleted. I did not check the size of the previous rig to see if it was a spudder rig or full size. Time will tell.

Thank you again so much.

This topic was automatically closed after 90 days. New replies are no longer allowed.