XTO Emergency Order Multiple-Unit Horizontal Well

Would this be pre or post pooling?

Secs 8 and 17-6N-11E.

It appears only Pace 1 in Sec 8 is producing. Are these 2 sections held by the 1 well or is that what XTO is attempting?

What is the number on the top of the order, both the CD and the Order?

Yes, Mollie. CD201500577 and Order 636972. Just had a hearing today apparently and moving a rig in. Wanted to lease if not leased already. Thanks.

Which section are you in? If you are already held by production in 8, then you are held by the first lease and the Pace well from 2007. If you are in 17, then you may be held by the McClure well drilled in 2008. There are actually two wells planned from the same pad. One is the 2-5H8 which stays in 8 and the other is the Tiffany 1-5HX17 which just barely goes into 17.

http://imaging.occeweb.com/AP/CaseFiles/occ5182823.pdf Here is the map.

Thanks. I’m in 8. HBP. Pace. Thanks for help.